Sprint
Conceptually there is one product-level Sprint leading to one integrated Potentially Shippable Product Increment.
This practically means:
- Sprint Planning for all teams is at the same time.
- Sprint Review and Sprint Retrospective is at the same time.
- The team-level Product Backlog Refinement doesn’t need to be at the same time!